The Result:
Initial production run in under 6 months enabling the product to be showcased at various trade shows.
The design incorporates cost effective manufacturing methods and intelligent design to aid quicker
assembly, service and maintenance all packaged in an elegant design featuring subtle LED
illumination for monitoring at a glance.